V&A Ceramics Gallery

Role: CDM Coordinator

Project: Refurbishment of Ceramic Galleries

Architect: Opera

The works comprise the light demolition and strip out of the sixth floor ceramic galleries 136 – 139 of the Grade 1 listed building followed by their general refurbishment which will include new exhibition displays and cases including narrative display with upgraded access for Museum staff and a new study area.  The works will also include;

  • Upgrade of heating and ventilation including new roof plant
  • Refurbishment, repairs and decoration of existing galleries
  • New high level lighting
  • Installation of new display cases by specialist Keijsers
  • Refurbishment of existing windows inside and out
  • Roof repairs as required
  • Solar window film installation

Duration:18 months

Date: complete January 2009